Hydro-Electric Scheme

Main Contractor: Jim Dorricott Construction Ltd.

This bespoke sump formwork was formed in the powerhouse floorslab for the turbine to sit into, which received the water intake from the adjacent Llysfran Dam to produce electricity.

20170720 083749 resized 1